Friday, October 15, 2010
"Reception" meeting
I'm leaving it up to David whether he wants to sign the paper or not: nothing has been finished, so we can amend to say "except X, Y & Z" or we can just hold off signing till all is finished; so much easier to do that from another country!
Jean-Marie did the measuring this morning, so hopefully the plans won't be too far away.
He seemed a bit quiet this morning but I'm not sure if he was just mirroring my mood...
M. Mekki, I'm going to miss. He kindly informed me that I'm not their most difficult client, and that they do have one; hopefully he will tell me all about her later!
It's odd trying to think of the job as "finished" when we still have to arrange for the tiler, plaquistes, plumber, electrician, and builder to come back to complete their bits...
The joiner is going to let himself back in, and the carpenter's last task is being held over for the next phase.
So, all-in-all, nothing is actually finished. Perhaps this is why the French are a nation of philosophers: they can sign legally binding documents agreeing nothing needs to be done well before the stage where nothing remains to be done?
The nice mustachioed man from Milesi unloaded our pallets of stone this morning, so that's another thing off the "to-do" list, but as it was never really on there in the first place it's a moot point!
Very kind of him, and MUCH appreciated.
Thursday, October 14, 2010
Day 47
Messrs Hamid & Jamel left fairly quickly after taking down the shuttering from the "chapeau" on top of the wall; there was nothing else they could do.
I'm going to miss them, particularly M. Hamid...
M. Baty, M, Philippe & M. Jean-Baptiste worked like Trojans [OK, so they didn't hack into my computer, but you know what I mean!] today and we now have windows front & back and door frames in the stable, shutters on the small windows in the back hall & shower room, new windowsills everywhere that they'd warped because of the chaux-chanvre drying out so slowly, a shutter back upstairs, a window embrasure re-lined, and the doors rehung in the small cellar and on the stairs.
Phew!
They deserved a beer [not least for putting up with my "tired" French, which is worse than my "normal" French!], and I was quite sad to see them go.
I wish I could watch the french window being fitted [and the shutters, which sound as if they will follow not too long after], but I'm more than ready to go home.
Just need to get through tomorrow morning's meeting...
Hopefully it won't be too bad, but I have a feeling that I may have to fend off reminders about the project manager's latest bill: David is of the opinion that things we've been waiting for since August mean that a bill sent in late September can wait for our queries to be answered, and I think he's right!
Either way, as he has control of the cheque book, there's no chance of them getting any money before the 15th October.
We're both pretty keen that the plans we paid for over four years ago should be corrected before any more cash is handed over; they knew they were wrong in July, so have had enough time to correct them...
Apparently, J-M is taking the measurements tomorrow, so looks like that cheque is staying put for a while longer!
Wednesday, October 13, 2010
Day 46
Cue huge levels of excitement; I find him the most chilled of the artisans, and love watching beautiful woodwork taking shape, and it means that the stable will become a usable room within the next couple of days.
I had a visit from M. Mekki: he wanted M. Hamid to break through the doorway to the house today, whereas I wasn't keen [until M. Baty has actually fitted the door/windows I'm suspending belief; I trust him, but experience has taught me that not everything happens according to plan, and I really don't want an unsecured house days before we leave the country!], so we were about to start negotiations.
Turns out that M. Hamid had more work than M. Mekki was expecting, so he will need to come back tomorrow anyway, so the doorway can be unblocked then. Everyone happy!
The cour anglaise looks fine; I'm not 100% sure about the sloping wall, but think that once we have plants growing along there, the slant mirroring the angle of the potager will look right, and we won't have additional wall hiding the view of the hay meadow.
I love having visits from Messrs Mekki and Luparello, and apparently they like coming here, too. M. Mekki says they always have a laugh; I think that's what raises my spirits so much.
That, and the 'can do' attitude; most refreshing.
My mission for this afternoon was to beg a favour from the guys at Milesi [yes, the chaps with the Manitou!]. I was hoping to see the very amiable guy with the proper Asterix moustache, as he always seems very smiley and friendly, but I decided it was better to get it over and done with...
The young chap I spoke too was, I think, trying to pluck up courage to come and see me: would I let them store their mini-digger here overnight?
Yes, no problem... Could you help me out with your Manitou on Friday for a delivery?
Yes, no problem... Once again, everyone happy!
It's one of the things I really love about this area: the folks are happy to put themselves out a bit to help you, and don't grimace at the idea - just the way we like to be, and the way life should be, but isn't always.
Nice interactions have given me a bit of a 'lift', so you get a post today.
*Grin*
Tuesday, October 12, 2010
End of tether...
The rare bursts of feeling half-normal I'm using to get as much weeding done in the garden as I can before winter sets in.
I'm hoping that M. Baty shows up tomorrow or Thursday, but really have got to the point where I no longer care.
M. Mekki thanked me on Friday for being very 'zen'; their most zen client ever. I don't think that tells you how relaxed I've been, rather it indicates how excitable the average French customer is!
I am feeling pretty zen at the moment: what is, is; what will be, will be, and I've no strong feelings either way...
But I'm fairly sure that's just exhaustion from lack of sleep and prolonged stress!
So if I don't post for a while, you'll know it's owing to microscopic amounts of enthusiasm...
[Either that or I've discovered how humans hibernate; something I've been mulling over since I heard about Pyrenean shepherds avoiding the worst of the weather on QI.]
Friday meeting/Day 44/Day 45/Meeting with M. Torelli
We had a meeting on Friday - basically, we're still waiting for plumbing action!
Messrs Mekki & Luparello were confident that the non-plaquiste work could be finished this week; the plaquiste is being held up by the absence of a plumber.
M. Waeber talked us through the "tapis" idea for the tiling, and really didn't seem happy with the number of cuts there would be if we went with the original idea. He proposed coming and showing us a variety of layouts (as he'd done for the kitchen), which he did yesterday.
The Friday meeting ended with us not really knowing when the work will finish because of pipework issues.
Day 44:
M. Waeber showed us diagonal (his preferred choice) tiling in the bedroom, and basket-weave as well as how we'd got the kitchen tiles; we've ended up choosing the same as the kitchen, hoping the cut edges will not be too noticeable!
M. Hamid came and did the sealing around the top of the room: he's filled the spaces between the lambourdes with lime mortar and small pieces of stone, to keep the rodents out.
He started work on the cour anglaise, too.
Day 45:
M. Hamid finished the cour anglaise, and re-did the rejingot for the front window, which had cracked.
I nabbed him whilst he had a board full of lime mortar and had him make good a missing piece of pointing in the back hall, and fill in the joints under the front door; looks so much better already, and once it's dried I think it will be perfect.
He's fairly sure he will be finished tomorrow; I'm quite sad, I will miss chatting to him.
Meeting with M. Torelli:
I think we've got it agreed that the upstairs wastes will go out through the [planned all along] piping in the laundry, thus minimising the noise heard in our bedroom, and removing the need for the extra sticky-out-bit to hide the soil pipe.
The proposed vent sounds ideal, but I've yet to see the technical sheet, so only have the haziest idea of how it will work. M. Torelli says he's had one for seven years, and has had no problems (or, more importantly, odour!) with it.
He suggested having another one at the top of the stack in the roof space - will be worth a go, as we sometimes get "continental plumbing" smells as my lovely uncle called them.
Thanks, Trev, I knew exactly what you meant!
Obviously M. Torelli can't come and finish the work before we leave for England...
Monday, October 04, 2010
Freudian slips
And I'm hoping the BT-Broadband-freezing-up-thing has saved me from an even worse one!
After a few days of ignoring all communication from T+B in my inbox, I've been going through them this morning whilst waiting for M. Torelli to show up [who isn't going to, at least not this week; an email just before lunch says he's coming next week], and I was doing them in reverse order.
So I saw the one saying that at the meeting on Saturday M. Torelli said he couldn't alter the plumbing and therefore we would have to go with re-doing the wall by the shower, before I saw the one they sent on Thursday [i.e. two days before Jean-Marie saw M. Torelli], showing the proposed new layout of the wall by the shower...
Hm! I was wondering how much effort they'd put into trying to pursuade M. Torelli to do what he should have done in the first place, and that J-M is getting paid to make sure he does.
Dashed a quick mail off to David saying:
Interesting to note that this was sent two days BEFORE his meeting with M. Torelli, at which point he decides to go with the attached...!Only I didn't send it to David, I hit reply instead! I've since sent one saying I'd sent it as a mistake, and David would respond to the original mail earlier, but I'm not impressed with myself. I hope they're not curious enough to ask Nathalie (their daughter) what it says...
I don't suppose he even mentioned it to M. Torelli!
I think this needs a reply pointing out that he really can't have made any kind of effort to talk M. Torelli into doing what he should have done in the first place and we really are NOT impressed. What do you reckon?
But even more I'm hoping that the cracker of a response to their mail asking for us to give them a recommendation didn't go [again, I intended to forward the mail to David, so it's all in English]:
OK, nothing I'm not thinking, and nothing I won't be prepared to put my hand up to if they received it, but as I say I'd REALLY rather that the occasional mail-fail that seemed to happen actually did happen.Having just got up to speed with all the other emails [this was the last one I read], I would be DELIGHTED for them to give our name as reference, so that we could prevent some other poor English people having to go through what we have!!
When he linked to their email, I nearly dashed one straight off saying "DO NOT TOUCH THIS COMPANY WITH A BARGEPOLE".
I think it may be more politic to say we are insufficiently happy with how work has been carried out to give them a reference? That doesn't mean we can't email V***** separately!
Can't believe he thinks we'd want to recommend them?!??!
[Am going to put the exclamation marks to bed now].
[It's not showing up in my 'sent items' box, but that doesn't always mean a thing hasn't gone].
I'm keeping my fingers crossed that it really did jam, but I don't want you to keep yours crossed for me; I don't deserve that. But I do hope that when we finally get around to telling them a few 'home truths' we can do so in a less offensive manner.
[When I want to be offensive, I put effort into that! But when I'm just "venting", I don't want people to 'hear' - I'd rather formulate my ideas into an ice-cold quietly-voiced speech than have someone catching me in full rant.]
*Now chastened*
Sunday, October 03, 2010
Beautiful day
So I did.
As suspected, it's been a perfect autumn for fungi [wet and not too cold with the odd glorious day] and I saw quite a few while I was out; usually I only see them in the woods.
Which makes me think that if we get another nice day, I'll head into one of the forests.
Sadly, the forecast is for more rain.
We may have a plumber tomorrow...
And of course we may not.
Saturday, October 02, 2010
Oh noes!
Does that mean I will have to stop making infusions?
No, it means I will either have to find another storage place [hm, laundry/boiler room, now there's an idea?], or start stacking them.
The bottles do stack really easily, but I'm still at the stage of turning them quite often, so until I'm content to just let them sit there, I might have to find a temporary place for any new ones and then stack them up when everything is all mixed satisfactorily.
I varied the pace a bit by collecting walnuts, but that's back-breaking work in comparison; how come David always manages to be in England at this time of year?
Chimney sweeps!
Yesterday I had the intention of doing my fruit liqueurs, then having a dose of Night Nurse and getting an early night. With the intention of lying-in till midday, should I be so fortunate!
Well, best-laid plans of mice and men, and all that...
M. Waeber showed up about 6-6.30pm, just as I was squishing the defrosted sloes, so I stopped doing that whilst we chatted. Next thing I know, it's gone 8pm and I still have a pile of fruit that shouldn't go back in the freezer. Neither was I happy with the idea of just leaving it in a warm kitchen.
So, I squished away, and filled jars with sugar and gin, and shook them, and wrote labels [before I could forget what I'd done; the sleeplessness is really causing memory issues!], and put the results in the (newly-branded) "fruit-liqueur-cupboard" [sounds so much better than "secret-gin-cupboard", don't you think?].
By which time is was nearly 11pm, so after a snatched supper and calling David and reading a bit in front of the woodburning stove to relax, it was 12.30am by the time I was starting to doze off.
Luckily I hadn't had something to make me sleep, for I woke up just after 9am feeling like a human being and was opening up the shutters [whilst ignoring the gate; pouring rain can do that to a person] thinking "Mmm, I'll light the fire, and finish the liqueurs I put off last night, and then laze on the sofa reading".
I was just about to find a waterproof coat to go and get some more logs/kindling and do just that, when M. Roussey showed up. His first question: "have you lit the fire yet?" should have alerted me to the fact that the ramoneur was due today.
Apparently, the other guy had just messed him around too long, and after waiting for the chimney sweep for over a month, he'd called someone else last week. Who got back to him at 8pm last night to say they'd be here today between 10 and 12!
Given how much mess there was last time we had the chimney swept, I didn't start with the "quarante quatre" just put some dust sheets on the sofas and made access to both of the fires.
Quick, painless, and very reasonable!
Johnnie said the reason the open fire smokes is that there isn't enough air flow; hmmm, given the hassle from J-M about that, there should be sufficient. There should also be an elbow on the outside to enoucarge air to pass into the pipes that flow to the fireplace; another thing that needs fixing...
Also, the zinc flashing around the chimney has lifted, so we need to get that fixed. I took their business card, but as we've used Charpenterie Auboise twice before (and want them to come and work here again next time we've saved up some money), I think we might contact M. Mazij first.
Obviously if he really is booked up till Christmas we'll give Angelo & Johnnie a call, but we believe that here it's best to continue professional relationships that work.
It's now turned nice (so I should be pulling out those weeds), but I think I'm going to resume my alcohol-transforming activities, and maybe will weed later if the soil dries out a bit.
One thing I did notice: I tried a small jar of non-squished sloes to see what happens, as several people had said freezing the fruit causes it to break open and thus avoids the tedious business of pricking each one with a pin. Well, I know it's only been just over twelve hours, but there's no sign of that happening yet, so I may be decanting that batch sooner than expected to flatten the fruit!
Just off to get some logs for this evening, then I'm going to get all domestic.
Oh, and the soot? About a third of a dustpan full, no mess and Johnnie vacuumed out the stove; tall, dark, handsome, uses a vacuum cleaner - I'm guessing he'd make a fantastic husband for someone!
Friday, October 01, 2010
"Secret-gin-cupboard" change-of-location
But I did have to move this year's efforts: M. Waeber needed to stock the tiles somewhere, and the entrance hall seemed the logical place, so I pushed the blue cupboard [future project making it not-blue] up against the enormous Basque dresser, having removed the Le Parfait jars first!
The cupboard in the study still seems [to me at least; David thinks it's OK] damp, so I put them in there.
Just been adding to my collection, and I think I won't say any more until I post the results of the "blind tasting" I'm plotting for if we come here at Christmas!
Warm, sunny autumn day
Obviously we have no workmen on site, but there was a flurry of emails yesterday afternoon whilst J-M and I were in that meeting, so maybe something's happening?
I'm currently in full-on denial mode; David said he'd handle it, and I'm letting him!
Thursday, September 30, 2010
Meeting
The long and the short of it is that we need the plumber to finish his bit.
He's ill again, and I don't know how quickly he's going to get better this time...
There is a meeting due to happen tomorrow or Saturday, which will hopefully iron things out, but at the moment the disturbed sleep is giving me "energy issues", so I haven't got it within me to get too worked up either way.
Either work is finished when I go back to London, or it isn't.
Either way, we won't/can't use the bedroom till it warms up next year, so I'm past caring just at the moment; dull, murky weather doesn't make me dash about achieving things at the best of times, and just now we are NOT in the best of times.
This, too, shall pass.
So I'll just play the waiting game, and pretend I'm being zen!
Wednesday, September 29, 2010
HR: read this first!
All that tells you is the people making the decisions who to interview/deciding the selection criteria would have got it wrong.
An ability to focus on the minutiae as long as necessary (before stepping back to look at the bigger picture) coupled with an eye for spotting something slightly out of the usual (with a view to investigating), separating things out into their component parts [however unnatural that may seem to system users], taking each step as it comes and changing tack as necessary, credible documentation of events (both planned-for and unexpected), together with a highly-developed (if at times slightly left of mainstream) sense of humour, I believe perfectly describes who you'd want working with/for you on your project.
[Forgot to add: can work alone or as part of a team!!! *wink*]
On paper: no chance. In real life: I'm getting stuff done where other people sometimes fail!
Slightly OCD lunch
I've decided to profit from the absence of workmen, and have a lazy afternoon hunkered down with a good book [an Agatha Christie, in case you were wondering] in front of the poêle, and am just having a late lunch first.
I blame tiredness/head full of other things, but I've ended up with:
- tomatoes on a chopping board
- avocado on a big plate
- cheese on a small plate
- crisps in a bowl
- dried tomato paste in a jar
I do know why it happened that way [I wanted salt & pepper on the fresh tomatoes, but not on the avocado, and the chopping board is covered in tomato juice, the cheese I'd already sliced and it was taking up all of a small plate, the crisps were all that I was going to have (as a snack) until I realised it was lunchtime, so decided to have the cheese. There was some tomato paste (like tapenade) that needed using up, so no point decanting it (and it goes beautifully with creamy-textured Caprice des Dieux). I don't like slicing food on plates as we prefer having sharp knives, and I've seen the damage that they can do even to the toughest crockery. By the time I added the avocado to the 'mix' (at which point, if there hadn't been a plate of sliced-up brie-type cheese already there, I would have gone for insalata tricolore; yes all on one plate!) I had to get another plate, but somehow the "picnic" look stopped me piling everything onto the bigger plate. Simples!], but I'm not sure the world at large will see what I'm seeing [a delightful repast with a couple of my five-a-day (up to seven today)], and might just look too deeply into something quite random. No, I'm not posting a picture as I'd no longer have the hope that you might think I'm kidding.
Before you think my formatting's got lost, I deliberately ran that paragraph together in the hope that it's TL;DR for most people, and I can sneak it under the radar!
Reminds me of an episode of Monk: Monk was eating at Sharona's house, and she'd put all the vegetables on the plate, touching!! Monk was desperately uncomfortable, till the son [whose name I've forgotten] got another plate to separate them out. It was at that point it became immensely clear to me that neither the director nor Tony Shalhoub has obsessive tendencies, as Monk was then happy, but some of the vegetables were still in the wrong place and touching!
Oh, I do miss that programme.
Together with Monica Geller from friends, Adrian Monk makes me feel so completely normal that I should be the poster-girl for normal!
Anyway, back to my segregated food...
Forgot to say
The room won't be finished in time for us to use it this winter: no central heating, yet...
[We're at the point where I'm playing the waiting game.
I'm coping with just the output from the poêle in the evenings, but it's only a matter of time...]
Today is warmer [13°C], but we've had several nights where it's been 5°C, and as the insulation for the bedroom is planned to be in the form of external cladding at some future unspecified date, it will be a stone-walled room with no heating.
Hmm, I've done that one, and am not doing it again unless/until we're on our uppers!
As an aside, apparently T+B are having a nightmare with the job in Cirfontaine...
From what we've heard [building trades grapevine is usually pretty accurate, even if I don't have any sources; sadly M. Hamid is not indiscreet!], plenty is going wrong there too.
Ahh, so much nicer to know you're not alone!
*end bitchiness*
Oops!
The brick pillar looks much better; not quite as convinced with the bottom of the wall, but most of that will be hidden by the layer under the tiling and the tiles themselves. Will probably have a bit of a ponder/measure and visualise...
David is calling Jean-Marie in response to an email; saves him drafting his own email saying that I need to go back to England, and that we are planning to leave on Monday 18 October.
If I stay, I risk getting tangled up in French tax issues.
Ordinarily, I wouldn't see that as a problem: no income = no tax to pay, you'd think.
But, and it's a big BUT, if I'm here long enough to attract liability, the French authorities count that as David also being liable for French tax, regardless of whether he's even visited the country...
NOT something we want; unless you have four or more children, the tax regime here can be pretty punitive, according to what we've read.
We might not end up worse off, but it's not a discussion we want to have to start having.
And the thought of trying to find a French tax accountant (and having to pay said adviser) is enough to have me heading for the hills!
By the time I'd finished this, David has spoken to J-M who is seeing M. Torelli at his office on Friday, so that at least seems to be moving.
David emphasised again the various issues with the plumbing, and said that we are unwilling to have workmen on site unless one of us is here [because of last time's mess and breakages, and this time's errors], so basically put T+B on warning.
I don't think he mentioned that fact that any work not finished will have to wait for next spring [I really do want a break from it all, and once I go, I'm not getting back into it again till the nights start to get lighter!], but we can keep that as an ace up the sleeve, should we need to.
All the trades agreed, with the exception of M. Baty (who is not yet holding up anything), that this job was totally "do-able" in two months: start early April, finish late May.
We didn't start till early June, but even so, to have the end of September tomorrow with no end in sight is a bit much. Even allowing for August being a month off, that's still three months and counting...
I hate feeling that we're being hard-line about things, but we're actually not; we're just finally putting down a foot that ought to have been stomped a long time ago!
Tuesday, September 28, 2010
No rain today, so we ventured out...
"That's a bit close to the house" popped into my head, so I took a close look; Claude was taking away the twiggy bits from when we cleared out under the two walnut trees by the road.
The tractor looked like one of those cartoon illustrations to show the destruction/devastation wreaked by deforestation, tearing off with a mouthful of vegetation!
When he came back for seconds, I took the photo, and here I think it looks like one of those deep-ocean eels: all teeth and no eyes.
Either way, it saved us masses of trouble, so I hope Claude likes the freshly-picked walnuts!
Not impressive was my "haul" of elderberries; so few that I'm embarrassed to post a picture. I'm going to make a 'micro' bottle of schnapps to see if it's any good, and if so I will get my act together next year!
I'm currently freezing all my fruit before making liqueurs; one post I read asked why anyone would do that if they didn't have to...
The answer is that in the 'blind' tasting, the frozen fruit performed best for flavour. Pricked fruit was the most colourful, so this year I'm freezing my damsons etc and then pricking them - hopefully the best of both worlds.
Not going to prick my elderberries [obviously], but someone recommended freezing them for at least a week, so they may break open of their own accord.
The early-harvest sloes got squished!
Day 43
Seriously, he has finished the walls (with a possible minor adjustment to the base - the line is supposed to be 1m above the finished floor, but it's not - either way, easily remedied should that be necessary), and has started on the brick pillar by the entrance.
It will all be ready for M. Baty next week...
[Although, as previously mentioned, I'm not sure M. Baty will be ready next week!]
Monday, September 27, 2010
Day 42
M. Huguenot showed up to see what progress has occurred since his last visit, but I don't think that M. Antony will be able to come and do anything until the plaquistes have been again...
With M. Kadir's mum being ill, we don't know when that will be.
Equally, after our visit to M. Baty's atelier on Friday, I'm not convinced that he will be coming next week to fit windows or door frames.
As always, I am trying [with greater or lesser success] to not stress about it all.
Happy 8th Wedding Anniversary!
Friday, September 24, 2010
Day 41
Still raining when I got up after a lie-in, and hadn't given up by lunchtime.
It did finally stop just before I took Messrs Hamid and Jamel a coffee, but they'd vanished, so David got two coffees after his lunch!
M. Hamid has done the rejingot and lisse [sorry, don't know the English] for the small window at the front, and some more pointing.
Thursday, September 23, 2010
Calm before the storm...
That hasn't stopped us feeling a big one might be brewing.
Happy vernal equinox!
Blowing up a storm
Another gorgeous day [Maria, lizards & hummingbird hawk moths all basking again] had got us thinking the météo had got it wrong, but apparently not.
Ooh, rumbles of thunder; I'm off to unplug the internet before the lightning comes.
Day 40/Meeting
With the walls being pointed, it's really starting to look like a room, rather than a stable with a nice new floor! We're on track for M. Baty to be able to come the week after next to complete that transformation (although the "finishing touches" [like tiles on the floor] will be mid-late October).
Just M. Hamid today; I asked him if more or less work got done without M. Jamel, and he said just the same amount! M. Jamel is unfailingly cheerful, though, and he fetches stuff, so that's a help.
Continuing with the pointing of the walls, which will last at least another couple of days, I think.
Jean-Marie had called yesterday whilst we were out, and Joëlle called this morning to see if he could visit after his first appointment - so we had the meeting today.
It felt a bit more productive than several we have had: he apologised for taking a snap/wrong decision over the panels of "agglo" which has effectively prevented us adding to the insulation above the bedroom. He assured us that there was a good depth of ouate de cellulose, so that it should be well insulated, but I'm not 100% convinced; being English seeing half the amount that we would use, and in a much colder country, makes me doubtful.
Hmmm, we shall see; if it's not a noticeably different temperature than outside we'll get Laurent Mazij back to take up his beautifully fitted boards...
I really don't want to piss M. Mazij off, as we're hoping he will come and do the carpentry when we can afford the next phase!
Our doubts about the absence of plumbing to the second [future] bedroom upstairs, coupled (I believe) with emphasising [repeatedly!] that we'd paid for a waste pipe in the laundry, and now we're having to pay for a second [unwanted, and planned-not-to-have - see pipe in laundry] one in the bedroom, and then having to pay a third time when we will actually get the plumbing done, has made J-M have a think.
The fact that the second [planned against] pipe will make an ugly, unnecessary corner in the bathroom, and doesn't vent produced a "what was I thinking of to allow this to happen?", and a promise to speak with M. Torelli; nearly an apology, but certainly an intention to do something about it...
So let's see: we could either hook up to the existing (vented) soil pipe [our preferred option], or we are considering bringing the wall alongside the shower flush with the pipe, and losing a bit of width in the shower. If we could also push the shower screen towards the wash basin/move the basin right a bit, we might only lose a centimetre or two from the shower, which would still make it bigger than the 80cm standard ones we see.
Jean-Marie said it was an error, and I compromised by saying [what seems to be my favourite phrase!] that it was an opportunity missed to choose the most elegant solution.
Please keep your fingers crossed that we can come up with a better result than is currently likely!
Wednesday, September 22, 2010
Day 39
Not great for the vendangeurs, who will have to continue with the grape harvest come rain or shine.
It's all starting to come together [at long last!], which is heartening.
We had a visit from M. Mekki, and the plaquistes are likely to be delayed as M. Kadir has had to rush back to Turkey as his mother is ill. Hope she gets better soon.
We'd been asking him all the sorts of questions the project manager should be dealing with, and said that we still had received no response to our email dating back to 25 August/6 September, so we had no clue what was going on, and we didn't know whether tomorrow's meeting would go ahead, and if so what time [last week's meeting didn't materialise, we think - we didn't actually wait in all day just in case!], etc, etc, etc. So basically we are just trying to liaise with the trades directly so that work still keeps progressing...
I'm not sure if is was a coincidence that about five minutes after M. Mekki leaving we received a very brief email from Jean-Marie stating that he will respond to our questions this evening, and that tomorrow's meeting may be on Friday morning or Tuesday...
I firmly believe in coincidences, but I also have strong faith that not everything that looks like a coincidence is one. Perhaps I'm being super paranoid, but I do know that M. Mekki is sensible enough to gather "brownie-points" when he can for later redemption when he needs to "get out of jail free"...
He doesn't throw it in your face that he's done you a favour when he wants to be allowed to change the scheduling, and it may only be a coincidence that stuff gets mentioned, but it may also be a "coincidence", if you see what I mean!
Anyway, he does a lot of work for Jean-Marie, so the mail from T+B may be a "coincidence", but either way if it gets a finger out, we'll be very happy.
The hummingbird hawk moths are out enjoying the warmth of the sun, as are the lizards, so we shall take our cue from them and go and bask in the countryside.
Happy glorious early autumn day!
Day 38
Luckily, the mortar has dried the right colour, so we don't have to ask them to re-do it!
Monday, September 20, 2010
Day 37
M. Hamid & M. Jamel are back at work, and today the sill for the bathroom window is done, as is the rejingot, and they've done a test-patch of the pointing on the bedroom wall.
Lucky I was here to correct the sketch sent out by Jean-Marie, as he'd apparently forgotten the rejingot! What a shame he didn't send it to us as well, as we could have pointed that out! Fortunately, M. Hamid has a [for the French; well, he is Berber, so that could account for it?] weird attitude in thinking that the customer should be happy with the results!
At this rate we should get all the building work finished by the time M. Baty comes and fits our windows.
Speaking of M. Baty...
Avast, me hearties!
Aarrrr!
[OK, he's not a pirate, but a pre-Revolutionary Frenchman will have to do! We were off watching Danton meet his end after his visit to the château in Charmont-sous-Barbuise, and this landlubber is
Monday, September 13, 2010
Snippets
I was looking over my photos - there's one of me in a white boiler suit cleaning off bricks (not going to post it; despite pretending to be Anneka Rice, it's not an image I want out there!), and another of a pile of bricks that is fit for the Tate...
It seems so long ago!
Well, in the scheme of things, it is.
Obviously, before we'd even started, we'd missed our deadline of end of May, and then finishing-before-everything-grinds-to-a-halt proved not possible, and now I haven't a clue...
Except: M. Mekki mailed today to say that with the end of Ramadan, he should be able to get workmen to our house next Wednesday, and hopefully all the plastering/building will be finished by the end of the month.
Just in time for the lovely M. Baty to come early next month and fit our windows, and the equally lovely (but in a slightly-less-pin-up way) M. Waeber to come and do the tiling.
After that we just need the builders back to break through to the house (which as it's already been done, and just blocked up, should take about 20 minutes + tidying), and lay the stone floor to join up with the back hall.
And then I can "spring clean" the place!
A lot of dust [that came out as "a love of dust"; NOT Freudian, I can promise!], obviously, which is always part of the fun of having builders in your home, and when we thought it was going to be done by end of July I just left the 'edges'... Still am, but I've pushed the vacuum cleaner round a few times and it's a bit less "crunchy", but until the bare mortar/concrete is covered the dust won't stop.
I don't know what's going to happen with the insulation/plumbing/step upstairs, but David seems a bit more hacked off with T+B than he was, so I think I might just retire to a safe distance; he doesn't blow his fuse very often [I've never seen it in 11 years], but I suspect it will be spectacular should we come to that!
Changing seasons:
Our rose by the letterbox is coming to the end of a fabulous display of flowers, considering I cut it right back, having planted it at completely the wrong time!
Thinking back, we were planting that one by moonlight - not following biodynamic principles, just taking longer than we thought to get the other two in the ground - in an attempt to get them to survive: here in July it was definitely NOT the time to be planting anything other than lettuces!
I cut it back so it could concentrate on sending down roots, rather than blooming, but I guess it had other ideas. The rain has obviously helped, and it's been lovely to see the flowers.
Petals on the ground, fog blocking out the Mairie, a last whiff of mown grass/hay, the increasingly frequent smell of woodsmoke - all reminders that autumn is on it's way.
The nice days are still bringing the lizards out of their hiding places, but no longer am I greeted with the sound of rustling every time I open the front door, as one scuttles out of sight. And I'm opening the front door every time it's warm - to let the warmth in - rather than keeping it closed to keep the heat out.
I love being here, seeing the seasons change, watching the leaves develop from the tiniest of buds, to soft green, then stronger/darker adult foliage. Now I'm enjoying the first of the golds in the process of preparing to drop leaf as part of the winter dormancy. No oranges or reds, yet; that will come, with the dropping temperatures and the first of the frosts.
The fogs are going to get more frequent, and soon I will be lighting the poêle out of need, rather than from the luxury of being able to burn stuff [London being a smokeless zone limits any pyromaniac tendencies to candles!] , so for now I am, like the lizards, basking in the last of the hot sun before it becomes pallid and weak (leaving me longing for sunnier climes).
Of course, we have the festival of light to look forward to at winter solstice and year's end: lighting as many candles as I can find holders for, to burn away the darkness and herald the start of growth for a new year. But that's a long time off...
Still, some sloe gin to be made!
White goods:
We've really joined the 20th century!
First, we bought a washing machine - oh, boy, is that wonderful?!
And now we have a brand-new fridge-freezer; it's currently skulking in the corner, waiting for David to arrive so we can decide where to put it. It's going to be a massive improvement on our temporary fridge that the tenants broke/lost all the door shelves in, and is missing another shelf: we will be able to stand bottles upright, and keep jars in easy reach. Waiting for delivery on Saturday gave me time to catch up on so many posts here!
What we want next is a cooker; it's weird how I rarely use the oven at home [biscuits excepted!], but not having one makes me long for a bake of some kind.
At least I can always go out for a pizza!
Welly pros & cons:
Pros:
- Waterproof
- Cheap
- Can act like a big kid at any age [ooh, those puddles are so alluring]
- Stylish & attractive [!]
Cons:
- Thin soles aren't fun on the sharp pebbles of farm tracks
- Not very warm
- HUGE blisters on the soles of my heels
Sadly in this instance the "cons" outweigh the "pros" and I'm confined to base as each step is too painful to go for a walk. I did think "oh, get over it, they're only blisters!", but literally limping home taught me that I may be tough in some ways, but the skin parting company from my soles is not one of them.
Hmm; blisters are the bane of my life [can't wear my MBT boots for too long as they give me blisters on the backs of my heels]!
On that note, I'm going to hobble off...
Saturday, September 11, 2010
Not day 37
x 4
- We had M. Waeber come round on the 3rd to ask if he's still starting on the 13th [like anyone's going to tell us that?!], and where he can stock the tiles. He is worried about the depth of concrete that will cover the pipes: if it isn't sufficient, the changes in temperature could cause the tiles to crack...
- We had M. Waeber, again, on the 7th to measure up for the tiles - he was taking exact measurements this time, rather that estimated ones - and to say he had gone to T+B's office on the 6th, and he's happy now with the plan for covering the pipes [having now seen Jean-Marie's sketch with it's wrong dimensions (9cm depth is greater than the 7-8cm we actually have!), and received an email saying it was planned that way from the beginning (erm, no, we only did it this way round to continue working whilst M. Torelli was ill; the pipes were supposed to be laid in the first screed of concrete) I'm still a bit jittery, but if M. Waeber's convinced it will be OK I'll just have to hope it will be OK], and to say that he's due on the 20th...
- M. Mekki came on the 8th [the day the plaquistes were due to resume work], to ask if SMS can delay starting again until the 27th... I said I'd have to ask David, and see whether we could put M. Baty back (which he's fine about); David replied to his email that we'd prefer if they could start on the 20th, as we think there's (at least) two weeks worth of work to do... And we really don't want our lovely new windows splashed with all sorts of crud like the last time [see below]. We're still waiting to hear back...
- On the 9th the tiles arrived [after getting to sleep about 8am, confident in the knowledge that the tiles were due on the 16th, I woke up about 11.30am to two pallets outside the bedroom window!]. Milesi, who are rebuilding the other part of the church wall had helped M. Waeber put them there with their tractor, and he came back later to help me put them in the house [if they hadn't have been stacked vertically I would have managed; but I was glad of his help]. He's now likely to come back after the windows are in; some time in October... Also, Nicolas came (in J-M's place); he doesn't know why the carpentry work was brought forward from early October to late August, nor does he know the answer to any of our other queries. No quite sure what the point of that visit was...
Nicolas did point out that normally the windows go in before the interior is as finished as we want it; I made a big thing out of pretending-to-be-French (think English woman being loud, volatile, arm waving) and said that no way were we having the kind of mess that we had the last time made on our lovely new woodwork this time.
I emphasised that I'd never seen such a mess after builders had been [totally true, and I pointed out the damaged double glazing units - all four in the main room we use!], and that my cousin in the Vendée said her builders didn't even leave the place untidy; I just can't trust that the site will be left in a fit state, and it's NOT going to happen.
[I didn't add "so there!", but that's probably more down to my lack of knowledge of how to say it in French than anything else!]
I am glad T+B are communicating with some people [although to be fair, it did sound as though M. Waeber just showed up and forced the discussion upon them], it's just a tearing shame we aren't on their list!
It feels as though Jean-Marie has lost all interest; he's certainly dropped all professionalism - the planning calender, weekly updates, sending everyone emails to let everyone know what's going on.
Part of me thinks that's because we've over-run his original estimate of two months work, but we never got a planning calender [it was all hand-written on my wall calender!], only received one weekly update [although I know the companies working here got two], and the only prompt emails we received have been the bill-chasing ones when we were determined to get the issue over the joinery sorted out before we settled the account; our queries about the insulation, plumbing for bedroom 2, and the step up from the corridor remain unanswered [the first email was sent on the 25th of August, a more detailed list of what we needed to know chased it on the 6th of September]...
Jean-Marie happily left for a week's holiday without responding; we are currently planning to factor in similar delays for any future payment we make, bearing in mind that if we need the carpenters back to take up the panels upstairs any cost caused by that WILL be coming out of the remaining fees owing; I'm not paying for any more of J-M's slackness!
So, other than expecting M. Baty at the beginning of October, and M. Waeber after him, I don't know who's due and when, so (as usual) I'm just busy trying not to stress about it all.
On a lighter note: our fridge has arrived, so I'm free to leave the house...
[I feel almost lighter for 'getting that off my chest', so this blog is still working as therapy!]
The little snippets I was going to post can wait for another time.
Obviously, one day it will actually be day 37. And one day it will actually be finished. Just not sure when!
Happy warm-autumn-day from this beautiful region where the already-sweet pinot noir grapes are just waiting for the vendange to begin...
[If I was French, I would be unable to resist the temptation to add "...and begin their journey of magical transformation to become the source of pleasure to millions that is the rich legacy of our region, champagne!" (or something similar).
But I'm not, so just be thankful I'm shutting up now!]
Day 36
This time we have got the telephone point installed!
[It was forgotten in Phase 1a, and has been a constant focus of Jean-Marie's ever since; why the big stuff gets totally ignored, but he can issue nine reminders about something we told him can wait till all the wires are connected up, we're not sure!
I came across a note in my garden diary from three years ago: "I'm tired; not sleeping well because of worrying about the things M. Boyer seems to be neglecting (steels for mezz., well water, corridor height for phase 2) in favour of the minutiae (taps bath, tiles, etc.)." Hmm, getting déjà vu, yet?!]
No-one needs to know that it doesn't work yet [waiting for it all to be connected; seems logical to do all the extra work at once]; neither M. Antoni nor I will tell J-M, I'm sure!
M. Antoni has got as far as he can for now; he needs other people to do their bits before he is able to do anything else, so he's off site for a while.
But here's the exciting bit: M. Baty came!!
Not just because I've got a bit of a crush on him [he is gorgeous, *swoon*], but it means that he's taken the measurements for our door and windows (and the paint for them), so he can start work now!
[And I could say (if asked, which I haven't been yet), "yes, M. Baty's been; it was worth getting that sill done for the french window".]
We'd made a couple of chasing phone calls, and played telephone tag on the first of September [he said he'd come at the end of August, and Maria is quite literal in her interpretations!], when we got a call back from Mme Baty about 7.30pm to ask if it was OK if her husband came on his way home from another job...
Yes, no problem!
[Quick, finally decide what we want!!! We took the sketches and a tape measure out to the stable, and had just definitively ruled out the three-paned option (glazing bar very close to eye height, so no-go there) when he rolled into the drive, phew!]
We've gone with the four-panes to each window, two opening central windows and a fixed window either side for the porte-fenêtre and plain glass (no glazing bars) for the two smaller windows.
He should be able to fit them at the end of September (although more on that, later), and plans to be here for two days and do various little other things, too (tinkering with sills, adding a sill, replacing a cellar door hinge, putting up our long-awaited back shutters, etc), so we are really pleased.
And once again, a big, HUGE thank you to John Knighton for his CAD skills!
We were able to show his impression of how the window will look to M. Baty (and posted him a copy; my printer is NOT up to the challenge of that without using up all my ink!).
We had a discussion about what style, and he said modern can be good (especially where no precedent exists; 19th century french window, erm, no), but we want something in the same style as the windows, so let's hope we've made the right decision!
Day 35
The thing with electrics is: it seems to take ages for not-much to happen, but if they didn't spend all that time with nothing to show for it, you would be able to see all the fruits of their labours...
Surely I can't be the only person who's gone into a beautifully decorated/restored/kept home & been amazed that in all that perfection people seem happy to have wires stapled to their skirting, or "hidden" behind that trunking that seems to be the alternative?
And don't get me started on 'pipes-as-feature', please.
I will admit that some of the runs can be pretty inventive, but that's admiration for things 'Heath Robinson' rather than things well done!
Seems like an age...
That would be because it is!
Serious lacks of both energy and enthusiasm combined to produce inertia after David went home from his holiday...
But I'm back now [even though the sleep thing remains elusive], and back to swinging my kettlebells, so here's to the return of normal.
No, don't ask me what it's all about; they were cheap (Barnado's in Brixton), new, & I liked the sheep (reminds me of one of my favourite books, "A Wild Sheep Chase").
I prefer to buy from charity shops if I can (reducing, reusing, recycling as I'm sure I've banged on about before).]
OK, let's clear that backlog!
Friday, August 27, 2010
Day 33
[Perhaps I'm "in denial"? Whatever it is, I'm finding it less stressful than talking with them myself! As a down-side of David being in charge, no awkward questions get asked, such as "what about the insulation?" or "what about the plumbing for bedroom 2?", so I'm not sure it's a 'goer' as a long-term solution. Hmmm, I think when it all returns to ground level I'm going to have to get the gloves back on.]
More electrickery today, but as we were lumberjacking, I'm not sure what!
Will take some photos of upstairs when I've found another iron bar to replace the latest broken rung of my ladder; I can't cope with missing a step and getting off the ladder at the same time.
Day 32
[Maria still debating whether to create a fuss, or just accept substandard project management in order to get those bloody people out of our lives; instinct says "get the insulation added", and "get the plumbing sorted", but I'm fighting against that as my head is saying "make them go away"!]
Sad to see them go; I've enjoyed chatting with Laurent, and they just get on with their work with no fuss, and minimal discussions, unlike the electrician...
Electrician arrived today!
He and his colleague are finishing off the first fix in the stable, and we had another long, involved discussion about the missing phone point in the kitchen, but I think it will be OK: the bare cable should be able to run in the gap that's opened between the insulation and the beam, and then behind the upright, with minimal channelling in to sit next to the power socket.
I just had a brilliant idea (if I do say so myself!), that if we are gouging out the insulation, we might as well add another socket which will cut out the adaptor plugged into the lightning-protection box (circuit breaker? I think in English we don't have these because all our plugs are fused?) for the internet router.
Day 31
David confirmed that no, we'd had a visit from the carpenters, and they were boarding out the space above the bedroom.
Mixed feelings on that one: it's great that work has started again, but as we were told this wouldn't be happening till early October, I didn't get chance to enquire why the space wasn't totally filled with the insulation (there's at least a four inch gap; I don't think that's a good thing, especially not with a pile of insulation standing by!), or whether we had resolved the issue about the plumbing...
I'm not remotely impressed with T+B: yes, they did send us an email (at 7.15am), but this was on the day the carpenters were arriving, and as we are on holiday, we're not checking the inbox before heading out for a day we planned in advance.
And yes, they did know that this fortnight is David's holiday!
Crap communication, as ever...
Quick update
We've been all rufty-tufty the last couple of days... [OK, buying a set of blue-painted furniture wasn't so 'manly', but that's a nice cheap project for me when the builders have gone - cobalt sideboard, table & four chairs for ~£33 can't be bad, and lots of fun to be had cleaning it up; if I can't take it back to nice wood, I can paint it cream!]
We chopped down seven or eight trees to rejuvenate the hedge by the road past the house, and this has let masses more light into the meadow; the damson tree in the hedge will also benefit from not having thuggish neighbours.
Also started to clear the brambles from beneath the walnut that we don't harvest from, and I've lopped off the low-hanging branches to make it easier to strim under. The bit by the hedge where David cleared last year was much easier to cut down this time, so our efforts are paying dividends.
Rain stopped play, so we diverted back to making fruit liqueurs; now David's in on the "secret" life's much easier - two of us pricking fruit is so much better [for me!], than just me doing it...
The mirabelles, Reine Claude plums and pig damsons in the freezer had got frosted [which finally spurred us on to the purchase of a new fridge-freezer; one that's big enough to store most of the vegetables/salad and has three freezer drawers], so we had less than we thought, but still have made several jars.
We also made the last of the mirabelles [sadly, after we arrived to find quite a lot of ripe ones still on the tree someone came and stole them the afternoon we went out shopping, so we only managed a tiny jar!], a few more Reine Claude, some little red plums from the other ancient tree in the meadow and some of M. Lorin's huge plums [he has given us permission to go into his orchard and help ourselves] into more liqueurs.
We decanted all of last year's efforts, and now have an interesting stock that just needs ageing to be a wonderful cupboard-full of interesting after dinner treats!
Today we emptied the freezer of sloes [and put the last of Tuesday's sloes in to freeze] and made two huge and one medium size jar; it's now got to the point where I feel I want to keep changing supermarkets every time we go to buy gin! Apparently, I should have waited till October to make sloe gin (despite them tasting OK; yes, still wearing my 'tough girl' hat!), but as they were already picked, cleaned & frozen, it seemed a shame not to try...
Doesn't mean I won't keep an eye out for sloes again after the first frosts!
Our paint has arrived from Holkham Paint so now we are just awaiting a visit from M. Baty...
We've decided to go for a different colour on the inside of the windows this time: Old White in the bathroom, and Parchment in the bedroom. Hopefully, these choices will prove acceptable, otherwise Maria will be getting out the paintbrush again...
[Please keep fingers crossed for the former; Maria has seen enough paintbrushes in the last 18 months to last a long time!]
Speaking of artisans, work has (unexpectedly!) started on the house again, but I shall post about that separately: see next post.
Sunday, August 08, 2010
Monday, August 02, 2010
Fruit liqueurs
Same for the pig damsons. The seedling next to the tree even had a couple of ripe fruit that tasted like damsons-you-would-eat, rather than damsons-you-would-feed-to-pigs, so I think next year I'll keep an eye on the fruit [when we can be around for them ripening properly], and then maybe we'll chop down the ruined old tree as planned.
It'll either work, or it won't!
But it's certainly worth a try; I'm reasonably sure that commercial growers don't wait till fruit is perfectly ripe.
Either way, I'll be posting about it [if I live!] later on this year...
Day 30/Friday meeting
Yesterday, it was packing up to come back to London which took priority (and then coming back to London, obviously)!
So, Friday meeting: I think Jean-Marie abandoned the idea of the "pre-reception" meeting pretty quickly - he listed the trades, and started with the plasterboarding; trying to get that as a 100% finished.
Erm, no, the gaine technique is not done, and there is a third coat of plaster to be put on the walls/ceiling everywhere!
OK, and the plasterboarding is the most complete.
M. Mekki was naughty [David & I are wondering if the lateness/randomness of T+B is getting to him and M. Luparello?]; I'd sent a mail thanking them for getting the sill done before the August break [as I said, we're quick enough to contact them if there's a problem, and with the sill I know it put them under additional pressure and we do appreciate that M. Baty can now come late August to take his measurements rather than waiting until the first full week in September is over]. I'd received a mail from both M. Mekki and M. Luparello saying 'thank you for your thank you'.
End of subject, except someone was stirring it on Friday, I think!
M. Mekki mentioned the mail, and how they really appreciate it, blah blah blah. I just looked him in the eye, and said "I think you're causing trouble" [in English]. He blushed, so I don't think I was wrong, but carried on anyway. I said "I'm watching you", and then he let it drop. I don't think J-M picked up that he was on the receiving end of a dig, but M. Mekki knows that we know. And moreover I know his English is a lot better than he lets on!
Anyway, back to the meeting: it degenerated pretty quickly into listing what needs to be done to finish, and putting dates to various jobs/trades.
J-M asked if we'd been talking with M. Waeber; no, that's your job, you are the project manager. If we were in charge I would have walked to the other end of the village & chatted with him [well, listened!], but as we didn't know until Friday morning when he could come [w/c 20 Sept, apparently] there seemed no point in seeing him to say "no, we don't know when you can start the tiling".
So with all that's left to do we're now looking at the carpenters finishing some time the first week in October! Hopefully, by then M. Baty will have been and gone...
J-M did like my changes to the upstairs plan, and promised he and Nicolas will draw up accurate drawings and make that alteration; I will be watching them like a hawk, so have every faith it will happen!
I was "de-mob happy", and couldn't wait to escape on my "holiday", so we said goodbye to M. Jamel & left him to it.
In his defence, he left everywhere nice and tidy. I hope he has a good time back in Morocco, and that his friends/family back there can chat with him in the same way that seems impossible in France.
Thursday, July 29, 2010
Day 29
No builders, but by now I'm just winding down to going back to London; I really don't care what gets done/doesn't, now that we have the sill in place & M. Baty can come and take his measurements in late August.
Anything that happens tomorrow will be a bonus.
[With my "Mystic Meg" hat on, I think I can foresee at least one meltdown from J-M, but as that's par for the course I'm not going to stress.]
[Yes, I do know "stress" isn't a verb; but it bloody well ought to be! Do compilers of dictionaries live in a building-work-free environment?!]
Wednesday, July 28, 2010
Day 28, continued
Can't remember what condition needs to be satisfied for them to continue, but I'm sure it will all come right in the end!
The builders have removed all the surplus plasterboards, and brought some new green [water resistant] ones. M. Hamid has been enlarging the cour anglaise, and that's been hard work, given that today has decided to go back to full-on summer weather.
He says he's back tomorrow; I'm just hoping to finish the sill to the bathroom window [apparently, that needs re-doing, so we will be on attempt number five to get that opening sorted!] and get those rejingots done, but I suspect the cour anglaise will take priority.
I was hoping to ask M. Mekki/M. Luparello, but today I didn't get a visit; shame, I like our multi-lingual conversations!
M. Luparello best sums up my linguistic abilities when describing his own: "je parle [insert language of choice] comme une vache espanol", however I like being able to add in a little Italian, Spanish, German, English or Welsh [I'm shoehorning in the very few phrases I know]; makes the French so much more *ahem* interesting.
However, it does mean I have to pay attention; it's one thing listening out for French words, it's another thing entirely trying to work out what language we are talking!
Tuesday, July 27, 2010
Day 27
It's not 100% perfect, but David & I made a couple of decisions, and we're happy with the result. If we could have moved the stones to the front of the opening, that would have been much nicer [and pleased M. Luparello!], but I think they needed to go over the polystyrene insulation to prevent cold bridging, so we made the best compromise we could.
M. Luparello thinks the stones would have looked better if all the original tooled edges had been neatly cut off as well; but he's Italian! Not meaning to sound dismissive [he's lovely, and he's actually Sicilian, so not Italian at all], but we've seen a few Italian building restorations, and the phrase "over-restored" seems tailor-made for the way they work.
It's a matter of preference [unlike the pragmatic decision to have the slabs further back than would look best], so we have got some wonky joints between the slabs, but M. Hamid is going to use stone-coloured mortar to fill them, so they will be (visually) minimised.
I'm finding out a bit more about M. Jamel: it seems he speaks an odd mix of Berber, Arabic and Spanish, with the minutest amount of (incomprehensible) French thrown in. As already ascertained, it's not just me that doesn't understand him; none of the French do, either. M. Hamid says he doesn't even speak Berber or Arabic well enough to be understood easily, and no-one on the job speaks Spanish.
He married a cousin, so I'm guessing she can communicate with him [enough at least to have a son!], but I still feel quite sorry for him; for me, being not understood [not even as bad as being misunderstood], makes me feel very lonely, as I am very particular about choosing my words to express exactly what I mean, and am living in a culture reasonably similar to my own.
Having got lost on Sunday [hello beloved!], for a while because we forgot to take a map out with us, and deciding to try just this last way before stopping and asking someone, then seeing Bar-sur-Aube on the signposts & being mightily relieved, makes me feel for a man who got lost this morning and couldn't possibly ask his way [or understand if someone could work out where he wanted to go and gave him directions] and can't read...
Makes me thankful that my French is slowly improving.
Did I mention people are now prepared to call me on the telephone even when they know David isn't here?
Progress indeed.
ETA: It's not my estimation that M. Jamel's mix of languages is odd, it's M. Hamid who says that, and he speaks Berber, Arabic, French and English [that I know of].
Monday, July 26, 2010
Monochrome
Day 26
I wonder whether we may have lost VMC function in the study for the next month, but that's better than how he started off: that can't be done. We countered with: Jean-Marie & M. Huguenot say it can. He tried: but the plaquistes aren't here to remove the housing. Us: we can do that. Then: but that would mean switching the VMC off. We responded: no problem.
Seems to have taken us at our word!
Because M. Huguenot is on holiday, and J-M hasn't told anyone where the VMC pipe is to go, we've left it at: the pipe can just be left on top of the wall for now.
[Thinking about it, maybe that means the VMC is working in the study?]
Complete absence of SMS; we were expecting a builder to lay the sill for the french window, and plaquistes to finish off the plasterboarding, but I'm not going to start worrying until tomorrow has been and gone without a word...
Sadly, David is now on a train for Paris, and then London.
I miss being spoiled!
Friday, July 23, 2010
Day 25/Friday meeting
It was supposed to be the "pre-reception" meeting today, but David and I had refused to even consider signing anything with so much work left to do, so Jean-Marie contented himself with thinking that next Friday will be the "pre-reception".David and I will cross that bridge when we come to it!
Today's meeting flushed out some positive aspects: M. Kadir [plaquiste who is now back from his holiday] and M. Huguenot [electrician's foreman] are sufficiently OK with the plan to remove that ugly VMC pipe that it will go ahead; M. Mekki brought the stone slabs [although having broken one, and having to tell me that they need to cut the others in half to properly fit the sill, he's lost at least half of yesterday's gold star]; M. Torelli has found a free standing WC "bati-support" [sorry, don't know what that is in English], so the partition wall around the loo can be finished.
Overall, it felt quite positive, and when M. Mazij came up with his brainwave I was delighted!
[So much so that I've been re-drawing plans already.]
M. Mazij said we could (in the future) cut out the middle section of the problematic beam upstairs: he would install a metal tie, higher up, and the proposed supports for the future mezzanine would run high enough that the ceiling height would be sufficient. So that means that bedroom 3 is back on again. I have now decided to profit from the absence of the beam [which had dictated having a small section of corridor to each of bedrooms 2 and 3], to add a dog-leg corridor and enlarge my box room.
Obviously, Jean-Marie and Nicolas don't know about that (yet), but as the panels of composite for the upstairs floor aren't being laid till September, they will have plenty of time to help decide where the step needs to be.
And it will be only one step required, so another bonus.
Ooh, I'm a big fan of carpenters!
I feel like we're making lemonade.
["When life gives you lemons..."]
ETA: Have just heard from David that when he went to the bakery this morning he met M. Waeber, who really isn't happy with T+B; he was sounding off, and David couldn't argue with him!
Thursday, July 22, 2010
Sodden critters
Time for some good news
I've made dentist and homoeopath appointments for when I'm back in England.
It's still raining off-and-on; so garden will be super lovely when it's next sunny.
We didn't have to decide on a bath, yesterday.
I'm really enjoying fitting in some yoga and meditation into my *ahem* "busy schedule"!
I've found a few sloe bushes with a half-decent crop. [Last year's provider of over 4 kgs (and you couldn't even tell where I'd been picking them) has four sloes this year; yes I did count them!]
I am now (semi-) regularly cycling as far as I usually walk!
M. Mekki has picked up four stone slabs (enough to do the sill), and he's being "green" and not coming today [I think it's really the meeting he has in Troyes, but who cares?], but bringing them tomorrow when he comes for the meeting; gold star for him.
Did I mention David's on his way?!
Penny drops...?
David phoned T+B this morning to speak to Jean-Marie; we felt it was better/less aggressive to speak to him directly than to send an email saying there's no way we will be signing any papers on Friday (or even next Friday) to say we are happy with how the work has been finished.
For a start, none of the work is close enough to being finished to be able to tell whether it will be done to a satisfactory standard or not, barring the brickwork around the bathroom window; that's now fine, but only a small part of the builders' work. Until we've seen the pointing on the stone walls, I'm not signing anything. I know I'm taking him at his own estimation, but I have high hopes that M. Hamid will be able to make a nice job of that, and I feel reasonably confident that he will lay the sill correctly.
Poor old M. Waeber should have started on Monday, and can't start till the electrician and plumber have finished [plumber may be here next Wednesday; he won't know till tomorrow's meeting], so there's no chance we can sign off the tiling! The carpenters are delayed because of the electrician and plasterers [who are fitting the insulation, and are missing some damp-proof fabric]. I think the plasterers can't finish until the builder has finished round the window at the back, and need the plumber to have finished first fix. The plumber is not attaching anything that can't be moved until he has had J-M's express approval. The electrician has put five lights in the wrong place, so needs to come and re-do some first fix electrics.
Obviously, we're not signing off on the joiner's work for J-M: that might mean paying him more!
We have managed nearly five weeks work since the beginning of June, but that's not the bulk of our problems.
It sounds as though T+B have finally realised they are not covering themselves in glory: David said that J-M, Joëlle and Nicolas have had a meeting, and I think he said J-M apologised for letting us down. My presence here has saved them from even more remedial works, and they seem to have finally noticed that... I don't know whether any of the artisans or entreprises have said anything to them; I wouldn't be surprised if they have... I've heard a bit of muttering, so I'm sure there's been a lot more!
I suspect what hurts them more is that they were expecting a glowing reference from another client and they didn't get it. I'm left wondering whether they are going through their client list to see who they can call upon for a recommendation, and have noticed how many problems we are having; it wouldn't surprise me if that was across the board, the way things have been this time.
The way I currently feel is that there's no way I'd even consider giving them a reference: their fees have meant that we can't do our bathroom/entrance hall floor, or the sauna or finish the terrace. We wouldn't have been able to do all three on that list, but we certainly could have done one and been working towards a second.
We seem to have paid for less-than-nothing, looking at it in bald terms: they have caused more work, and not saved any expenses, but because the specifications were wrong/lacking we've now had to find more money just to finish phase 1b!
A few examples:
- the plans are wrong, so we have to go back to the drawing board for upstairs, [and not just the drawing board, we may need to remove/re-route plumbing, which needs to be done before the carpenters enclose the space above the joists];
- so many of the sketches have been wrong that we've had to re-lay the concrete for the sill, re-do the sill of the bathroom window, re-do the lintel of the bathroom window [and the brickwork is "wrong" because the builder & I decided that would "do" rather than starting again from scratch: J-M expressly stated which courses to start on to get the pattern correct... Also, Nicolas & I spotted the angles were wrong before the plaquiste had bent the bathroom out of shape!
- speaking of wrong sketches: the electricity plans show three light switches in not-legal locations in the bathroom; the electrician moved them and pointed out he was prevented from putting them that close to the bath;
- still banging on about sketches: the carpenters followed the drawing for the non-lowered corridor, and then had to spend two days undoing their work & doing it again properly. Would we have insisted on that if we'd known the plans for upstairs weren't right? I don't know, we'll have to see when they are re-drawn;
- the "cour anglaise" was specified 1 m across, to allow for a 65 cm window and a 63 cm shutter... Even David's arithmetic can spot that that won't work [obviously another addition to the bill to make it bigger];
- no plan for sealing in the insulation upstairs: we don't want to create a rats playground;
- the spec missed out the bathroom window [for the builder, not the joiner; we pointed that out before the spec was sent out and again after the estimates had been passed as correct];
- the plumber's estimate was "verified" as correct during the six or seven weeks they were "checking" them, but he'd missed out all the upstairs plumbing [so we've got another invoice for that];
- no time plan/calendar, so I don't even know when I'm expecting workmen or if any haven't shown up; the original "plan" was on my calendar, but that has slipped somewhat;
- oh, and if they weren't involved, everyone except M. Baty said they could happily start at the beginning of April and be finished by late May; we believed them, too!
Sorry, I'm not meaning to start a rant [done enough of that already], but just giving a few indications why I don't think I would recommend them as project managers. My experience has been: manage the workers yourself, cut out the project management as much as possible, and try to un-do as many problems as you can caused by incorrect drawings before it's too late; without those drawings, we'd have had far fewer issues to address!
And did I mention that I was still cross at J-M yelling at M. Mekki?!
What would it take for me to change my mind? The only thing we can think of would be a full refund, and completing the rest of the work in a exemplary fashion [and I don't for one second believe that would be a possibility!], and even that than would just get them a lukewarm reference.
If they offered that? Part of me would be tempted, but only because we could get the bathroom finished. I think the honourable part of me would still refuse to give a potential client anything other than a warning...
But the daydreaming part really would like to get our chosen wall tiles ordered before they, too, are discontinued, and the only way for that to happen is for money to appear by magic!